小姐一般不让嫖客干什么,日本理伦片午夜理伦片,亚洲一区波多野结衣在线 ,国产无套精品一区二区

Product search
Electrical Control System of Double-inlet and Double-outlet Coal Mill

Electrical control system of double-inlet and double-outlet coal mill includes low voltage cabinet for control auxiliary equipment, electrical ear measurement device for controlling and monitoring material position and differential pressure measurement device. Low voltage PLC cabinet is the core of control system control and monitors, the mill operation through receiving the entire signal and transmitting the signal to center control DCS system by bus interface. With the ladder diagram program required by equipment production technology, according to the input command signal, PLC shall judge and logical process and send relevant command to make sure all the parts of mill operate efficiently. 

 

NHI double-inlet and double-outlet coal mill electrical control system with advanced automatic control equipment can achieve the following function; mill can operate safely and continuously around 300 days with no faults. During the running of mill, wearing parts can be filled in with mill non-stop, and mill can response fast according to load variation. Mill can realize double-inlet and double-outlet, single-inlet and double-outlet and semi-grinding according to the requirement of boiler load. More than 400 NHI production coal mill electrical systems are in safe operation in the coal-fire power field in Southeast Asia and North America.

主站蜘蛛池模板: 黄浦区| 府谷县| 子长县| 蛟河市| 黎城县| 安龙县| 鹤岗市| 曲靖市| 金门县| 临桂县| 亳州市| 襄樊市| 开远市| 平顺县| 沛县| 阳江市| 固阳县| 乐安县| 松潘县| 乌恰县| 响水县| 龙海市| 漠河县| 宝山区| 武川县| 阿克陶县| 呼玛县| 慈溪市| 九寨沟县| 乐至县| 巴塘县| 梁山县| 永丰县| 金塔县| 白银市| 永昌县| 永顺县| 南安市| 安平县| 湾仔区| 凯里市|